MN-004-2015

Andy Johnson, MnDOT Highway 53 Relocation and Bridge Project construction engineer, points to a crane that will be used to lower equipment 240 feet down a sheer cliff to facilitate engineering borings on the proposed alignment for the relocation of Highway 53, in Virginia, Minnesota.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s