MN-007-2015

With the iconic Duluth Aerial Lift Bridge raised to its highest point and locked in place, Chief Bridge Operator, David Campbell, watches as the 740-foot-long CSL Laurentien approaches the bridge. On this July morning, the ship was schedules for fueling and then would be loaded with iron ore pellets.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s