Faces of Transportation Photos – 2018
Paving operation on Route 60 in Cumberland County
Hampton Roads District Structure & Bridge Engineer Derrick Keltner along with Jeffery Shaun Smithdeal and E. Alex Jarrelli heads up a rope access inspection of the High Rise Bridge in Chesapeak Va.
Temple Ave Improvements, paving operation. Colonial Heights Va.
I-66, Inside the Beltway 1st toll gantry lift.
A crew with Werner repaves a section of Nebraska 71 north of Scottsbluff on Friday, June 8, 2018. Photo/Jake Daniels
Wade Rhoads and the Hampton Roads Side Scan Sonar Crew scans Holston Lake at the Aven’s Bridge (State Route 670) before bridge replacement.
Flagging operation at a concrete bridge deck patching project.
Repair efforts are seen in progress on the Highway 15 bridge over Highway 30 north of Schuyler on Tuesday, May 29, 2018. Photo/Jake Daniels
Randy D. Smith, Equipment Operator at the Manassas Area Headquarters.
The Hampton Roads Side Scan Sonar Crew scans Holston Lake at the Aven’s Bridge (State Route 670) before bridge replacement.
Environmental protection measures such as fiber rolls being installed on a construction project to convert a section of the US 83 Northwest ByPass just north of US 2 from 2 lanes to 4.
US 58 West Midtown Tunnel under construction, Portsmouth side.
Bridge deck repair pothole repair on bridge near hwy 51 Gurdon Okolona exit in Clark co. District 7 d7 I30 interstate 30 jackhammer used traffic ARDOT employees
A crew with Werner repaves a section of Nebraska 71 north of Scottsbluff on Friday, June 8, 2018. Photo/Jake Daniels
Construction of Wildlife Crossing on US Highway 85 just south of the Missouri River. Contractor places concrete beams across abutments with large crane.
Atlee Road Extension construction in Hanover County.
Construction at the I-64 Interchange at Route 15, Zion Crossroads
Photos from the Nebraska City Southeast Project, shot on Friday, April 13, 2018. Photo/Jake Daniels
Temple Ave Improvements, paving operation. Colonial Heights Va.
Hampton Roads District Structure & Bridge Engineer Derrick Keltner heads up a rope access inspection of the High Rise Bridge in Chesapeak Va.
23rd/ 29th Ave. Overcrossing Replacement Project, Styrofoam block installation for abutment on east side of 23rd. Ave. overcrossing.
DCIM119GOPRO
Temple Ave Improvements, overhead sign installation. Colonial Heights Va.
Temple Ave Improvements, overhead sign installation. Colonial Heights Va.
Construction at the I-64 Interchange at Route 15, Zion Crossroads
Peel Ferry barge christening new barge for Peel Ferry District 9 Marion Co.
Bridge replacement project on I-94 near Sterling, ND
Digital Smart Cone deployed in a maintenance workzone with technology to assist in worker safety. Tyler Strand applies a new silane solution to an Interstate bridge to help with preventative maintenance by helping shed water and preventing corrosion.
You must be logged in to post a comment.