Faces of Transportation Photos – 2018
Atlee Road Extension construction in Hanover County.
Temple Ave Improvements, paving operation. Colonial Heights Va.
Hampton Roads District Structure & Bridge Engineer Derrick Keltner along with Jeffery Shaun Smithdeal and E. Alex Jarrelli heads up a rope access inspection of the High Rise Bridge in Chesapeak Va.
Construction at the I-64 Interchange at Route 15, Zion Crossroads
Environmental protection measures such as fiber rolls being installed on a construction project to convert a section of the US 83 Northwest ByPass just north of US 2 from 2 lanes to 4.
Digital Smart Cone deployed in a maintenance workzone with technology to assist in worker safety. Tyler Strand applies a new silane solution to an Interstate bridge to help with preventative maintenance by helping shed water and preventing corrosion.
Bridge deck repair pothole repair on bridge near hwy 51 Gurdon Okolona exit in Clark co. District 7 d7 I30 interstate 30 jackhammer used traffic ARDOT employees
Flagging operation at a concrete bridge deck patching project.
Temple Ave Improvements, overhead sign installation. Colonial Heights Va.
Construction of Wildlife Crossing on US Highway 85 just south of the Missouri River. Contractor places concrete beams across abutments with large crane.
Hampton Roads District Structure & Bridge Engineer Derrick Keltner heads up a rope access inspection of the High Rise Bridge in Chesapeak Va.
Bridge replacement project on I-94 near Sterling, ND
Paving operation on Route 60 in Cumberland County
A crew with Werner repaves a section of Nebraska 71 north of Scottsbluff on Friday, June 8, 2018. Photo/Jake Daniels
I-66, Inside the Beltway 1st toll gantry lift.
Wade Rhoads and the Hampton Roads Side Scan Sonar Crew scans Holston Lake at the Aven’s Bridge (State Route 670) before bridge replacement.
Peel Ferry barge christening new barge for Peel Ferry District 9 Marion Co.
DCIM119GOPRO
US 58 West Midtown Tunnel under construction, Portsmouth side.
Temple Ave Improvements, paving operation. Colonial Heights Va.
Temple Ave Improvements, overhead sign installation. Colonial Heights Va.
Repair efforts are seen in progress on the Highway 15 bridge over Highway 30 north of Schuyler on Tuesday, May 29, 2018. Photo/Jake Daniels
23rd/ 29th Ave. Overcrossing Replacement Project, Styrofoam block installation for abutment on east side of 23rd. Ave. overcrossing.
Photos from the Nebraska City Southeast Project, shot on Friday, April 13, 2018. Photo/Jake Daniels
Randy D. Smith, Equipment Operator at the Manassas Area Headquarters.
The Hampton Roads Side Scan Sonar Crew scans Holston Lake at the Aven’s Bridge (State Route 670) before bridge replacement.
A crew with Werner repaves a section of Nebraska 71 north of Scottsbluff on Friday, June 8, 2018. Photo/Jake Daniels
Construction at the I-64 Interchange at Route 15, Zion Crossroads