Bridge replacement project on I-94 near Sterling, ND
Temple Ave Improvements, overhead sign installation. Colonial Heights Va.
Temple Ave Improvements, overhead sign installation. Colonial Heights Va.
Construction at the I-64 Interchange at Route 15, Zion Crossroads
Environmental protection measures such as fiber rolls being installed on a construction project to convert a section of the US 83 Northwest ByPass just north of US 2 from 2 lanes to 4.
Paving operation on Route 60 in Cumberland County
Hampton Roads District Structure & Bridge Engineer Derrick Keltner along with Jeffery Shaun Smithdeal and E. Alex Jarrelli heads up a rope access inspection of the High Rise Bridge in Chesapeak Va.
Bridge deck repair pothole repair on bridge near hwy 51 Gurdon Okolona exit in Clark co. District 7 d7 I30 interstate 30 jackhammer used traffic ARDOT employees
Temple Ave Improvements, paving operation. Colonial Heights Va.
Randy D. Smith, Equipment Operator at the Manassas Area Headquarters.
Photos from the Nebraska City Southeast Project, shot on Friday, April 13, 2018. Photo/Jake Daniels
Repair efforts are seen in progress on the Highway 15 bridge over Highway 30 north of Schuyler on Tuesday, May 29, 2018. Photo/Jake Daniels
Digital Smart Cone deployed in a maintenance workzone with technology to assist in worker safety. Tyler Strand applies a new silane solution to an Interstate bridge to help with preventative maintenance by helping shed water and preventing corrosion.
23rd/ 29th Ave. Overcrossing Replacement Project, Styrofoam block installation for abutment on east side of 23rd. Ave. overcrossing.
Construction at the I-64 Interchange at Route 15, Zion Crossroads
Peel Ferry barge christening new barge for Peel Ferry District 9 Marion Co.
I-66, Inside the Beltway 1st toll gantry lift.
Wade Rhoads and the Hampton Roads Side Scan Sonar Crew scans Holston Lake at the Aven’s Bridge (State Route 670) before bridge replacement.
DCIM119GOPRO
US 58 West Midtown Tunnel under construction, Portsmouth side.
Temple Ave Improvements, paving operation. Colonial Heights Va.
The Hampton Roads Side Scan Sonar Crew scans Holston Lake at the Aven’s Bridge (State Route 670) before bridge replacement.
A crew with Werner repaves a section of Nebraska 71 north of Scottsbluff on Friday, June 8, 2018. Photo/Jake Daniels
Flagging operation at a concrete bridge deck patching project.
Hampton Roads District Structure & Bridge Engineer Derrick Keltner heads up a rope access inspection of the High Rise Bridge in Chesapeak Va.
Atlee Road Extension construction in Hanover County.
A crew with Werner repaves a section of Nebraska 71 north of Scottsbluff on Friday, June 8, 2018. Photo/Jake Daniels
Construction of Wildlife Crossing on US Highway 85 just south of the Missouri River. Contractor places concrete beams across abutments with large crane.